Slight delay with production status
over 2 years ago – Sun, Aug 08, 2021 at 09:35:33 PM

Hello everyone I hope the update finds you well.


Just a update to the production status for the Goetia, Tarot and Zodiac sets, unfortunately it will be delayed a week or 2, what I had planned for September shipping will most likely be October shipping due to what I am calling "the sage of the gas valve" 


I originally planed to have this update after the sage was finished but sadly I just found out a few hours ago it continues on.

So about Thursday (cant remember if was Wednesday) of last week the metal melter was acting up a bit (chuffing or pulsating a bit) so we tried to adjust the air flow, and check for leaks, etc.. a lot of different troubleshooting steps and finally to move the melter to a different section of the workshop to try a different hookup in case it was the supply line or the regulator, since none of that changed anything I disassembled the gas valve to check for debris blocking a port etc and that seemed to do the trick all was well afterwards, great since by then it was late Friday and problem solved we called it finished until Monday.

Monday rolled around and the melter ran great and continued to run great until it was up to temperature and needed to shut off but it still wanted to run great and not stop, OK sounds like the solenoid is bad, probably was fluttering in the beginning and causing the pulsing but decided to give out when I cleaned it.

No problem I have a spare gas valve that I picked up along with an old melter for spare parts, but since this is  "the sage of the gas valve" it cant end there

that spare gas valve must have got some moisture in it and spent the next 10 years corroding, so neither the valve nor the solenoid was usable. The saga continues

Not really a problem since we know it just needs a new gas valve, so I order one in and then everything seems to go smooth (smooth since I was just waiting for parts so nothing new), got the new valve put it on, aside from needing a couple different connections since old inlet and outlet was 1/2 inch and new was 3/4 inch it went on easy enough. oops spoke to soon the new connections change the location a small amount shouldn't normally be a problem but now the inlet pipe hits the pot leg and it wont be centered on the melting stand so spend some more time rerouting the inlet pipe. (told you it was a saga) but got it all rerouted and better than before.

Start up the melter and oops now it blew out the pilot flame when it started, after lots of adjusting still blows out the pilot but that's ok I can swap out the pilot assembly for one that's about 1/8 inch closer and that should help it stay lit. 

After a bit of swapping (had to drill the bracket for larger mounting holes)

new pilot seems to not blow out, oops now the pilot gas tube connection is leaking (this tube is aluminum so it doesn't take much fiddling to cause a leak at the compression fitting) and since I have already shortened it a bit during this saga to fix an earlier leak caused by swapping the valve a few times  I don't have much extra to mess with but a new fitting and 

I get the leak stopped with no tubing to spare. pilot staying lit but will test it better the next day (this was Thursday next day was today) good thing I had ordered some more pilot tubing after I had to shorten it previously (will get it Monday) 

Go on in today and pilot blows out every 3rd or 4th time(its still a saga), adjust the thermocouple to shied the flame a bit (the sensor that detects the pilot flame) and that helps but still blows out after 9 or 10 cycles, I will change the pilot orifice to a different size to stop the blowing out but don't want to cause a leak with the pilot tube until I get more tube on Monday.

Get home today and the pilot tubing is delivered early (things are looking up) what, things are looking up? this is a sage remember.

open the package to check it instead of just bringing it to the shop (when its becomes a saga you just know)


they sent me some automotive fuses instead of the tubing which means that it will be Wednesday until the tubing gets here, but will change the pilot orifice on Monday and hope for no leak.


This would make a great epic poem but since its late you have to settle for a haiku 


No metal melting

It took a long time to fix

Hope it works Monday



To sum it all up it puts the project back a week or 2 but still not so bad since about 2/3rds of backers where 44 pentacles only and those rewards are already shipped.


There was a lot of smaller things that I left out of the sage since the major things where enough to make a large update.


Almost forgot some pictures

New and old valve, burner in the background
corroded valve, that couldnt be used
the fuses they sent me instead of aluminium tubing, 1/4 fuses instead of 1/4 tubing


My wife's Instagram and Facebook page if you want to see some more images.

Instagram

Facebook

Thanks again for all your support

Arthur

Rewards shipped for 44 pentacle only backers
almost 3 years ago – Sat, Jul 10, 2021 at 09:08:45 PM

We have shipped out the rewards for backers with only 44 pentacles, these are backers that did not get any addons at all.

About 1300 backers have been shipped so well over half of all backers have their sets on the way, for the USA backers they should be there in just a few days, international backers will obviously take longer.


The original Kickstarter project estimate was for September shipping so we where much earlier than that, in my revised shipping estimate from an update or 2 ago it was for end of June beginning of July and we took about 1 week longer than I expected so I will bump the add-on shipping 1 week ahead to September beginning October

It was very early for that add-on shipping estimate so it will probably need a couple of weeks added to it.(lots of backers chose add-ons since that estimate) 


There are about 20 or so backers that have no addons but completed their survey as we where shipping this past week, they missed the shipping report by just a few days so they will be shipped within a week or two.


My wife's Instagram and Facebook page if you want to see some more images.

Instagram

Facebook

Thanks again for all your support

Arthur

Charging cards for the 44 pentacle only backers
almost 3 years ago – Wed, Jun 23, 2021 at 08:11:12 PM

Hi All

I will be charging cards for the 44 pentacle only backers, this is mostly the international backers that did not get charged shipping during the campaign so it will not affect most backers as anyone with addons will have their cards charged at a later time.


We are on track to ship out the 44 pentacles only backers sets in July, I was hoping to get them shipped out in June but they most likely wont be ready for another 2 weeks so July it is. This will be the 1100 or so backers that didnt get any addons and will be about 2/3rds of the total backers so it will definitely take a few days of packing to get all these out.


A few days after the cards are charged I will lock the address's for this first batch so if there are any address changes please make then within the next few days.


After these pentacle only backers get shipped we will start work on the Goetia and Tarot production runs but I wont have a status on that until we start.



My wife's Instagram and Facebook page if you want to see some more images.

Instagram

Facebook

Thanks again for all your support

Arthur

Address locking for non addon backers
almost 3 years ago – Thu, Jun 10, 2021 at 01:50:02 AM

Hi all, I hope everyone is doing well and enjoying the last days of spring (although it feels like summer is here already).


Backers with add-ons in Backerkit

If you added sets from my past Kickstarters your address will not be locked until August and your card will not be charged until about 1 week after that. (you can still make changes to your Backerkit until then)

The delayed locking is so it will be closer to the shipping date and less problems with address changes since the Goetia and Tarot add-ons will ship in September (or hopefully earlier depending on production)


Backers with NO add-ons in Backerkit (or only 44 pentacle add-ons)

If you did not add older sets or only added 44 pentacles sets then address will be locked next week on Monday or Tuesday (June 14 or June 15), I originally planned on locking them a bit earlier but it took a little longer to get the backer response to above 85% (I didnt want to lock without most backers responding)

After address's are locked any cards that need to be charged will be charged (only cards charged for UK/EU shipping or if you got extra 44 pentacles sets)  

The 44 pentacle rewards should start shipping this month (June), about 2/3rds of backers did not add any extra's so that about 1400 backers for pentacle only shipping (still a few hundred have not done their survey) 


I hope I didn't make this update to confusing


My wife's Instagram and Facebook page if you want to see some more images.

Instagram

Facebook

Thanks again for all your support

Arthur

Backerkit link in case you havent done your survey yet
almost 3 years ago – Wed, Jun 09, 2021 at 10:38:18 PM

Hi

I have had a couple of backers ask how they can check if they need to do their survey so I thought I would send it to everyone just in case.


You can goto the Backerkit project page at the link below and input your email address that you pledged with and use the "Get my survey" button and Backerkit will send you a link.


This only works if you use the email address that you pledged with on Kickstarter


Backerkit project link

https://pentacles.backerkit.com/



Arthur